Non-auto construction projects in Chicago

There are 17 construction projects listed here and none are about automobiles. Additionally, there is information about 2 studies for bus rapid transit-like projects.

Download all of these into Google Earth with this KML file. Links to maps coming soon.

A couple of these projects are being held up by the current Illinois roadway construction workers’ strike. UPDATE: Apparently a deal has been reached to end the strike.

Streetscapes

  • Blue Island/Cermak – I wrote about this project at length in October 2009. Construction should begin as soon as the strike is resolved. Map.
  • Congress Parkway – Full details and renderings from CDOT (PDF). Project should begin in 2010 and will narrow lanes, reduce number of lanes, straighten lanes (no more mid-intersection lane shifts), widen sidewalks, and improve crosswalks. Will add a lot of landscaping and unique and decorative lighting. Map.
  • PROPOSED: Lawrence Avenue between Ashland and Western. Reduce the number of travel lanes from four to three, adding bike lanes and a center turn lane. Project limits include the rebuilt Ravenswood Metra station at 1800 W Lawrence. More details on Center Square Journal. Construction wouldn’t begin until 2011.

Transit

  • Morgan/Lake Green and Pink Line CTA station (new) – Details and renderings from CDOT (PDF) – Overview from Chicago Transit Authority – Tons of bike parking included at the beginning, how it should be. Construction should start this year. To better serve the West Loop area, where more people are moving to, but also has lots of existing businesses. Map.
  • State/Grand Red Line CTA station renovation – Construction should finish this year. Map.
  • 35th/Federal Rock Island Metra station (new) – Construction started in 2010. Map.
  • LaSalle/Congress Intermodal Center – To improve connection between buses and the LaSalle Metra station. Mentioned in the Congress Parkway streetscape presentation (PDF). Map.
  • Wilson Red Line CTA station renovation – Down the street from a new Target store that opens this weekend and hundreds of brand new housing units in the Wilson Yard development. Will use TIF funds from the Wilson Yard district. Overview on CTA Tattler. Map.
  • Ravenswood Metra Station – A popular station on the Union Pacific-North line (to Kenosha). Will add longer and sheltered platform and become accessible. Details with Chicago Square Journal.
  • FLOATING: New Green Line CTA station at 18th or Cermak. Roosevelt station serves three lines. South Loop neighborhood fast growing. The new station would improve transit access to McCormick Place (at least if built at Cermak). Follow the Chicago Journal for more news on this topic. Map.

morgan cta station rendering

Rendering from the Chicago Department of Transportation (CDOT) showing context-sensitive design. See the full presentation (PDF) for architectural influences.

Bridges

  • Halsted Street over North Branch Canal of the Chicago River. Replaces 99-year old moveable span with fixed span. No information on how it will accommodate the Halsted Street bike lane. Construction to begin in 2010 (PDF). Map.
  • Navy Pier Flyover – Elevated section of the Lakefront Trail to bypass current bottleneck where the Lakefront Trail currently enters the Lake Shore Drive bridge over the Chicago River and DuSable park. Details from CDOT presentation on July 15, 2010. Map.
  • PROPOSED: 35th Street pedestrian bridge over Metra/Illinois Central tracks and Lake Shore Drive to lakefront and Lakefront Trail. Bridge will be self-anchored suspension, like the new Bay Bridge from Oakland to San Francisco. Overview on Burnham Centennial (drawing says 2007). Map.

Array

Rendering of the Navy Pier Flyover as it travels over the Lakepoint Tower condominiums as seen at the Cities and Bicycles forum with David Byrne in June at the Chicago Cultural Center.

Other

  • Various CREATE projects. All CREATE projects involve railroads in some way and most projects will construct grade separations. I’ve written about CREATE.
  • The Chicago Park District opened a new beach at Oakwood/41st Street this year. The grand opening for the beach house happened this past Saturday.
  • The Chicago Park District is currently building a harbor and marina immediately south of the 31st Street beach. The Public Building Commission of Chicago has the details and renderings. AECOM, the architect of record, produced these concept drawings (PDF). It appears how bike riders currently navigate the intersection at the entrance to the beach will change to be a little more normal and not force bike riders on the sidewalk. It’s unclear how many new parking spaces are being created along the lakefront – the fewer the better. The concept plan shows a new parking lot on the west side of the railroad tracks, a design I wholly support.
  • FLOATING: Luann Hamilton mentioned at the Cities and Bicycles forum with David Byrne in June that CDOT was thinking about a buffered bike lane on Wells Street.

31st street harbor concept rendering

Rendering of the 31st Street harbor concept plan. As seen in the contractor’s presentation to the Public Building Commission of Chicago.

Related

Although not construction projects, two additional proposals merit your attention. The Chicago Department of Transportation and the Chicago Transit Authority each received grants this month to study and develop two corridors with bus rapid transit-like features. CDOT’s plan is to develop a priority bus lanes for up to seven routes between the Metra stations and Navy Pier and North Michigan Avenue (the Miracle Mile). Thank you to Kevin Z for the update.

CTA’s grant money is to fund the development of a speedy bus service from the southeast side to the West Loop via the north-south Jeffrey Avenue.

View Comments

Motoring is triple threat to bicycling and the environment

Array

Location: Northwest corner of Clark Street and Congress Parkway.

This photo shows the damage that automobiles inflict on our cities, environment, and, closest to my heart, bikes and bike parking.

An errant motorist jumped the curb and crashed first into the tree, then the bike rack, and finally the bike parked here. The LaSalle Blue Line station entrance is just steps away (in the background). Imagine the fate of a bicyclist who might have been locking their red Schwinn road bike to the bike rack only to find a 2-ton metal box hurtling in their direction. This photo makes clear how driving is a threat to so many aspects of our streets.

The collision had a direct monetary cost. The city will most likely pick up the tab for everything except replacing the bike. Here’s what I surmise from the photographed scene:

  • Tree removal and replacement: >$1,000
  • Bike rack removal and replacement: $450 ($300 for a new one, $150 to remove)
  • Vintage Schwinn: $200
  • Bike removal: $50
  • Cleanup: $150
  • Total: At least $1,850

Please drive carefully. Send me your photos of the automobile imposition – reader updates are here. But wait, I’ve encountered this again and again:

Array

Location: Northwest corner of Elton Avenue and Cicero Avenue.

Array

Location: Northwest corner of Lawrence Avenue and Kostner Avenue in front of Chicago Public Library, Mayfair branch.

UPDATE: Thanks for the mention, BikePortland.

View Comments

Pollution fighting bike lane, coming soon to Pilsen

A planner from the Streetscape and Sustainable Design Program in the Chicago Department of Transportation (CDOT) came to speak to my Sustainable Development Techniques class at UIC about adding “green” to urban design.

Among other topics, he talked about CDOT’s streetscape project for Cermak and Blue Island in Pilsen, a near southwest side neighborhood a couple miles outside of downtown Chicago. The project, like all streetscapes, is one of economic development. But this project is unique in that the goal was to look at every element and make each as green and sustainable as possible.

Array

You can read about the project through the Program’s presentation here (Flash slideshow). Please note there are many versions of the same presentation on the web and each my be different depending on their intended audience.

I will be discussing a single showcase element from the project: A bike lane on Blue Island between Ashland and Western where currently one does not exist. The bike lane and the adjacent parking lane (on the bike lane’s right side, as normal in Chicago) will be constructed with permeable pavers mixed with smog eating concrete. Wait? Smog eating concrete? Keep reading!

The bike lane will begin at Ashland/Cermak/Blue Island, a well-traveled intersection for heavy trucks, three bus routes, and many passenger cars. The bike lane will connect Pilsen to Little Village and extend the existing bike lane on Blue Island in Pilsen’s central shopping area. This segment is also a designated truck route and to safely accommodate the parking lane, bike lane, and travel lane, the road will be widened by reducing the width of the sidewalks. The sidewalks here are 20 feet wide, double the standard width, and four times wider than sidewalks in many parts of Chicago. There’s very low pedestrian volume here and very little residential use so the plan is to have 8 foot wide sidewalks, and a 5.5 foot planter, breaking occasionally for bus stop shelters.

The bike lane will be 5 feet wide (including striping) and the parking lane will be 8 feet wide. The novel part of the two lanes is that they will be made with permeable pavers.

Array

This will be the first paver bike lane in the City of Chicago. The blocks will be oriented so that bicyclists feel the least amount of bumps and won’t get their tire stuck in a groove that could harm.

Array

The smog eating concrete’s trade name is TX Active, invented by Italcementi Group, a large, multinational corporation founded and based in Italy. Since the original installation of TX Active cement on the Dives in Misericordia Church in Rome (designed by Richard Meier), Italcementi has developed two lines of photocatalytic cement, only one of which reduces pollutants in the area (TX Arca). The other cement is for architectural uses helps keep the concrete surface clean from dirt and particulate matter.

Array

CDOT will use the second line, TX Aria, in the top half inch of the pavers. The company has tested the product to demonstrate its effectiveness at reducing the presence of Nitrogen Oxides (commonly written as NOx, a family of toxic substances emitted by internal combustion engines) and published its laboratory results in an easy to follow report on its website (PDF). The technical report goes into more details and explains how the process works (through photocatalysis) and what substances their product can be designed to diminish. The technical report is unclear on whether or not all forms of the TX Active product abate all substances. It may be that the maker only tested its effects on Nitrogen Oxides levels.

I look forward to watching the construction progress and to breathing the cleaner air while bicycling to a new destination in Pilsen.

View Comments